/
/
Soft Strip

Soft Strip

Often building uses change and refurbishments are required.  For refurbishment projects, we take extra care to preserve the integrity of the building’s structure.

Using only light machinery and hand stripping methods, we ensure that the building’s load-bearing elements remain unaffected, while all non-structural features are carefully removed leaving the building in a shell like state ensuring a clean slate for the next phase of the project.

Our flexible approach allows us to tailor our services to your specific needs, whether you are planning a full building renovation or a partial refurbishment.

A Soft Strip Demolition involves the careful removal of all non-structural elements from a building including:-

Removal of Fixtures and Fittings: Safely dismantling and disposing of furniture, built-ins, and decorative elements.

Removal of Load-Bearing and Non-Load-Bearing Walls: Precision demolition to ensure structural integrity.

Internal Ceilings: Stripping ceilings for better access or refurbishment.

Temporary Structures: Removing scaffolds, false walls, and other provisional builds.

M&E Systems: Efficient removal of mechanical and electrical installations.

For demolition projects, our internal strip-out services clear the way for the main demolition process, allowing for efficient waste management and recycling of materials.

We work closely with your demolition schedule to ensure the strip-out phase is completed on time, enabling the project to move forward without delay.

Soft Strip Case Studies

001
Angel Inn Hotel
Case Study: Brewery, Portslade
Brewery, Portslade
Eastbourne Magistrates Court (4 Storey)
Case Study: Claremont Hotel
Claremont Hotel
Concrete Crushing
Richmond House Care Home
Facade Retention and Partial Demolition After Fire Damage
Sovereign Lighthouse - Eastbourne
Sovereign Lighthouse
Newhaven Port Facility
Port Facility
Unit 10 Newhaven Square - Newhaven
Unit 10 Newhaven Square
The NHS – Various Locations
The NHS