Demolition

Angel Inn Hotel

Project Summary: Restoration of the Angel Inn Hotel and Adjacent Buildings Following a devastating fire that destroyed the Angel Inn Hotel and surrounding businesses in Midhurst, urgent intervention was required to address significant structural damage. The fire left the buildings unstable and posed a risk of collapse, necessitating immediate safety measures and road closures. North […]

Facade Retention and Partial Demolition After Fire Damage

Project Summary Following a severe fire that destroyed the Angel Inn Hotel and adjacent businesses, significant structural damage to the buildings required urgent action. Due to safety concerns, North Road, the main road through Midhurst, had to be closed, creating a major inconvenience. The closure forced a lengthy 13-mile detour around town, which affected not […]

Sovereign Lighthouse

Following the decommissioning of the Sovereign Lighthouse off of the coast of Eastbourne, we were contracted by Herbosch-Kiere to undertake the first phase of the demolition works. The “Pepperpot” and the top deck were disconnected from the structure out at sea and brought inland by barge. Once it arrived at Shoreham Port, working with the […]

Port Facility

As part of the upgrading of the steel turning plate within the Newhaven Port facility, we were contracted by Mackley’s to remove the old, damaged, redundant turning plate. This was a steel frame structure in excess of 200 tonnes that needed to be removed in its entirety. For us to be able to do this, […]

Unit 10 Newhaven Square

We were employed to undertake the soft strip out and roof removal works at the above site. As part of these works, the client required the structure to be fully protected with a designed specialist temporary scaffold roof structure.

The NHS

Over the years, we have carried out several projects at NHS sites including the full demolition of the following locations so that new housing could be built; Royal East Sussex Hospital – Hastings St Helen’s Hospital – Hastings All Saints Hospital – Eastbourne More recently, we have carried out the full demolition of the Burton […]

The Arndale Centre

We were employed to undertake the demolition and recycling over two phases. Phase 1 – Required the design and installation of temporary works Robotic demolition Diamond Sawing and drilling The above was carried out to facilitate the enabling works for the project. Phase 2 – This required the demolition of multiple structures ranging from two […]

Redevelopment Of Terraces

We were commissioned to carry out three phases of strip out and demolition works. Careful consideration had to be given to the method of demolition as the structures being removed were above The Sealife Centre and a 24 hour gym both of which remained operational during the demolition process. The location of the structures meant […]

Southgate Building

We were contracted by Balfour Beatty to carry out the safe demolition, slab removal and crushing of all suitable materials to lay as a piling mat of the Southgate Building. This building  was located directly beneath the main flight path. The building was a selection of warehouses and workshops suppling the airports busy maintenance division. […]

Waste Transfer Station

Following a major fire, we have been employed by our client, Viridor, as Principal Contractor. This ongoing project initially required the design and installation of 130 tonnes of scaffolding props to support the damaged roof trusses. We were then required to strip all cladding and roof panels back to the main superstructure. The next element […]